Skip to main content

ISRO to launch the fifth navigational satellite IRNSS-1E

ISRO to launch the fifth navigational satellite IRNSS-1E on January 20.

The satellite will be propelled into space by ISRO’s workhorse launch vehicle PSLV-C31.

What is Indian Regional Navigation Satellite System?

  • It is an indigenously developed Navigation Satellite System that is used to provide accurate real-time positioning and timing services over India and region extending to 1500 km around India.

  • The fully deployed IRNSS system consists of 3 satellites in GEO orbit(geostationary orbit)and 4 satellites in GSO(geosynchronous orbit) orbit, approximately 36,000 km altitude above earth surface.

Why Indian Regional Navigation Satellite System?

  • The requirement of such a navigation system is driven because access to foreign government-controlled global navigation satellite systems is not guaranteed in hostile situations, as happened to the Indian military depending on American GPS during the Kargil War.

  •  The IRNSS would provide two services:

                              1.The Standard Positioning Service open for civilian use.

                              2.The Restricted Service (an encrypted one) for authorised users (including the military).

  • IRNSS would have seven satellites, out of which four are already placed in orbit.

Comments

Popular posts from this blog

Inland Waterways in India

Here are some key points you need to know: The bill seeks to add 106 inland waterways to the existing six National Waterways on the recommendations of the Parliamentary Standing Committee on Transport, Tourism and Culture and comments of several state governments The bill will also look after the renovation and maintenance of the existing waterways Out of the 106 new waterways, 18 have already been identified. These include five waterways each from Karnataka and Meghalaya, three each from Maharashtra and Kerala, one each from Tamil Nadu and Rajasthan The bill also aims to help the Inland Waterways Authority of India (IWAI) to develop the feasible stretches for Shipping and Navigation. Let us look at the six existing National Waterways in India: National Waterway 1 (NW1) The National Waterway No. 1 uses a 1,620-kilometre stretch of the Ganges River. It was declared a national waterway in the year 1986 and runs from Allahabad in Uttar Pradesh to Haldia in West Bengal....

INS Kadmatt commissioned at Naval Dockyard in Visakhapatnam

INS Kadmatt commissioned at Naval Dockyard in Visakhapatnam  INS Kadmatt, the second ship of Project 28 class ,anti-submarine warfare (ASW) corvettes, was commissioned at the Naval Dockyard in Visakhapatnam. INS  Kadmatt  is the second of four anti-submarine warfare corvettes built for the Indian Navy by the Garden Reach Shipbuilders and Engineers of Kolkata under Project 28. INS Kadmatt has been named after the Kadmat Island of India’s Lakshadweep Islands. The primary role of the INS  Kadmatt  is in anti submarine warfare – to protect ships in convoys and ports from enemy submarine attacks. What is anti submarine warfare? Anti-submarine warfare    is a branch of underwater warfare that uses surface warships, aircraft, or other submarines to find, track and deter, damage or destroy enemy submarines. Successful anti-submarine warfare depends on a mix of sensor and weapon technology, training, experience and luck. Soph...

Environment Ministry notifies revised standards for Common Effluent Treatment Plants

Environment Ministry notifies revised standards for Common Effluent Treatment Plants (CETPs) Across industrial clusters-PIB CETP • The concept of common effluent treatment plant has been accepted as a  solution for collecting, conveying, treating, and disposing of the effluents  from the industrial estates. • The effluent include industrial wastewaters and domestic sewage generated  from the estate. • This CETP concept helps small and medium scale industries to dispose of  their effluents. Otherwise it may not be economical for these industries to  treat their wastewaters or there may be space constraints. • Some of these industries may require to give preliminary treatment (for  removal of solids) so that the receiving sewers can be maintained free  flowing. • It may be required to correct pH or removal of specific pollutant before the  industry discharges in CETP. CETP • CETP is designed on the basis of: – Quality and flow rate of the wastewa...